3D-Dig2000 »
QEDplus
BlastCalc
QEDCalc
Other programs |
3DDig2000

3d-Dig 2000 is a system designed to model mining processes. It
is based on a 3 dimensional digital terrain modelling engine. Unlike
conventional systems, which provide for independent construction
of completed pits and spoil dumps, 3d-Dig allows for the modelling
of the excavation, dumping and spoil transport processes. The 3d-Dig
2000 program is supported by an array of modelling and visualization
functionality. An animation system allows details of a proposed
completed design to be packaged and transferred to any PC for communication
purposes. In this way, the most complicated mining processes can
be effectively demonstrated to relevant personnel at all levels.
The 3d-Dig 2000 mining simulation system provides:
- Detailed dragline simulation.
- Topographic modelling including excavation and dumping simulation.
- Full 3-dimensional visualisation and animation of all mining
processes.
- Detailed volumetric and productivity reporting.
- Full topographic and visual representation of geology and mining
surfaces.
- Accurate visual representation of mining equipment.
3d-Dig 2000’s advanced modelling functionality is supported by a user
friendly graphical interface. All functions and settings can be accessed
by an intuitive system of menus, buttons and dialog boxes. The system
comes with comprehensive manuals, provided in both hard copy and digital
format, as well as extensive training and resource material.
3d-Dig 2000 applications include:
- Topographic studies & analysis.
- Equipment scheduling, both short and long term.
- Developing life-of-mine dumping and final landform strategies.
- Pit design optimisation.
- Researching, developing and validating new mining methods.
- Communicating plans to operations and management personnel
|